Dark metal tube construction located on the following requirements : 1. Metal pipe clamp fixed applications , the spacing between the support point should not exceed 3 meters. 0.3 meters away from the junction box office, the card will use the tube pipe fixed . In the elbow where both sides have fixed .
2 cable and cable with pipe laying, shall be within the pre- plastic -tube underground pipe . The cable laying pipe in the child , so that separate cables and cable laying , the outer diameter of the tubes should be 2.5 times the cable diameter . 3 When the weak and the strong electrical conduit pipes laid in parallel , you should try to keep a certain distance between the two to 13CM or so. 4, when the line specified with , the bending radius of not less than 6 times the tube diameter , when only one between two junction boxes is bent, the bending radius of not less than 4 times the pipe diameter . 5 horizontal vertical distribution lines laid out protection tube, its horizontal and vertical mounting tolerance of 1.5% , a total length of Dacron tube diameter deviation should not exceed 1 / 2.6 . Pipe should not be folded flat and cracks , the tube should be no iron and burrs , cutting off the mouth should be smooth, the nozzle should be smooth . 7 thin wire threaded pipe connections must be connected to the pipe threading length joint length of not less than 1/ 2 , should be added to both ends of the pipe joints across the ground wire ( not less than 4 mm2 copper wire ) 8 . concrete floors, walls and brick structures of the various information points concealed junction box and pipe connections shall be forced mother fixation. 9 Concealed inside the junction box with concrete requirements with wet cement paper or plastic foam filled inside , not the outside wrapped with cement . Embedded in the floor, walls inside the pipe , junction boxes should be fixed firmly to prevent displacement.
10 When conduit is connected directly to the device , the device should be laying pipe junction box ; when the pipe is connected indirectly with the device should be added wire protection hose or flexible metal protection tube ( metal hose ) connection ; optional Hydraulic tube fittings shall not use metal hose as grounding .11 galvanized steel or flexible metal wire protection tube jumper ground wire should be grounded using a dedicated line card jumper should not be used welding connection. Ming steel tube should be neat and fixed-point spacing should be uniform , steel pipe card should meet the maximum distance between the specification requirements : Pipe cards and terminals , elbows midpoint , electrical appliances or junction box ( box ) .
12 should be from the edge of 150-500 mm , the middle tube card maximum spacing : thick-walled steel pipe DN15-20 is 1.5 m , thin-walled steel pipe DN15-20 is 1.5 m , ceiling pipe should be laid out inside the pipe requirements of the construction .
13 pipe threading pipe before the water and debris should be cleaned , the wire in the tube may not have Hydraulic hose fittings, joints should be carried out in the terminal box , plastic should be added at the nozzle tip guard , different circuits , different voltage levels, AC and DC conductors shall not penetrate the same root canal .
14 tubing through the building expansion joints , expansion joints at both ends should remain grounded junction box and bolts.
hydraulic tube fittings,hydraulic hose,hydraulic fittings is with a one-way valve, one is without a check valve. Application with check valve, check valve and the gas source is connected to the end, when you disconnect the check valve closes automatically when you turn on the activity side thimble-way valve is opened. Is the use of self-locking ball is embedded in the groove, while the locking balls from "tapered cylindrical ---" sleeves.