2013年9月2日星期一

Remove and disintegration of the input shaft and the rotor member subsequent steps:

Remove and disintegration of the input shaft and the rotor member subsequent steps(1) Check the pump and turbine wheel (blade resonance test)2) Remove the bearing condition by measuring the Hydraulic tube fittings Hydraulic tube fittings bearing clearance3) Check the scoop tube body wear.4) Check the fusible plug, if necessary, replaced with new parts(5) re-scrape back after bush loaded (if necessary grinding shaft)6) cleaning rotation within the housing product oil and dirt.

没有评论:

发表评论